Search

Library: Looking forward to the November vote

Updated: Jul 31

Letter to the SC Sentinel, 7/26/2022


When the “new” libraries were built in Capitola, Felton, and soon in Aptos, the location of all these new buildings is the same as the old one. Replacement in place. In the case of the downtown branch, the whole issue is the moving of “place,” disrupting heritage trees and eliminating open space.

— Susan I Stuart, Santa Cruz

Recent Posts

See All

Letter to the SC Sentinel, 8/3/2022 Apparently Don Lane (Guest Commentary, July 30) has so much lipstick smeared on his rose-colored glasses that he has trouble seeing the pig – the proposed eight-sto

Letter to the SC Sentinel, 8/3/2022 When considering whether or not to build the mixed-use facility on lot 4 in the downtown area, it seems like we should first consider each of the three elements sep

Letter to the SC Sentinel, 8/3/2022 ...neither Don Lane or Stephen Kessler is going to change anybody’s mind; you either like lovely old magnolia trees or you don’t. — Jan Harwood, Santa Cruz