top of page
Search

Letter | Design Housing – not a divisive multi-use project

By Letters to the Editor | Santa Cruz Sentinel October 5, 2022 at 5:00 a.m.


If the mixed-use project on Lot 4 was about housing, that’s what its design would maximize. Instead, the complicated eight-story and 1.5-acre project runs sidewalk to sidewalk from Lincoln to Cathcart along Cedar Street, a mass of concrete and design tangents that include disparate elements.


A garage, when we’re overbuilt in parking garages? A library, when Measure S dedicated funds to renovate our library where it is now at Civic Center?




— V.J. Girsh, Santa Cruz

Recent Posts

See All

Editorial | Our choices on local ballot measures

By Editorial Board | editorial@santacruzsentinel.com | Santa Cruz Sentinel October 5, 2022 at 5:00 a.m. Measure O – City of Santa Cruz Our Downtown Our Future – General Plan and Downtown Plan Amendmen

bottom of page